Latest news

To carry out technological transformation of slip ring generator to reduce the loss of failure
Ma Huangshan No. 4 wind farm phase Ⅲ and phase Ⅳ (Huianpu Hanas Phase I, Huianpu Master Phase I), there is a burning phenomenon on the ground of some fan generator, which causes the ground carbon brush to wear too fast and the failure rate increases.
Posted on 2018-01-29 08:40

Large Parts Replacement Work in an Orderly Manner
Generators are vital components in wind turbines. In the event of a failure, replacing the generator is a tedious and complex task.
Posted on 2017-02-26 03:18

The standardization of site management has been steadily improved
Site standardization management is an important part of the enterprise standardization management system.
Posted on 2017-08-17 02:54

Strengthen Technical Exchanges and Inspire Team Growth
With the implementation of the VESTAS composite support service framework agreement, the establishment of the fan overhaul team has basically been completed.
Posted on 2017-09-04 03:48

Procurement of GE All-Dimensional Endoscopy System to Provide Technical Support for the Detection of Gearbox
In August 2017, the company procured a comprehensive all-dimensional endoscopy system from GE, which is the most advanced and cutting-edge internal inspection system in the world’s machinery industry.
Posted on 2017-08-27 03:14

Efficient Implementation of Large Maintenance Operations on the Tower
As an important part of the fan structure, in the past, it need to rent a large crane for the gearbox replacement due to its failure, which was a difficult work of long cycle and high cost.
Posted on 2017-11-12 03:34

Taking the Trouble to Repair the Fan Tower Base and Roads
In mid-October 2017, the Fan Maintenance Department conducted maintenance and repair of the fan foundation and road damage in the Yanzhou first wind farm, cleaning up the barriers for routine maintenance, troubleshooting and repairs.
Posted on 2017-10-17 03:08