Menu
  • CSR
  • Media Center
  • Media Coverage
  • News
  • Videos
  • Join Hanas
  • Diversity and Inclusiveness 
  • Growth and Flexibility
  • Work-Life Balance
  • Job Opportunities 
  • Contact
  • Planning and Development Department Actively Cooperate to Speed up the Dashuikeng 300,000 kilowatts Wind Power Project Construction Progress

    Planning and Development Department Actively Cooperate to Speed up the Dashuikeng 300,000 kilowatts Wind Power Project Construction Progress

    Since 2017, the Planning and Development Department of Ningxia Hanas New Energy Group actively cooperated with the design of 300,000 kilowatts of Dashuikeng wind power project under construction in Ningxia Yanchi wind farm to strengthen routine contact and communication with the project department and identify problems in time. The Department arranged project managers and professional engineers, from China Power Consulting Group North China Electric Power Design Institute Engineering Co. Ltd. and State Grid Ningxia Electric Power Design Co. Ltd. to the scene several times, which has done a good job in design and service to solve technical problems during construction in order to ensure the smooth progress of the project.(Writer: Planning and Development Department    Shen Jun, Photographer: Wang Zhengming)

    We must strengthen the code of conduct for road safety so that all roads must be checked and...